How to submit your snagging report to the developer

You have the report — now what? A practical, step-by-step guide to submitting your findings to the developer, keeping a clean paper trail and following up until every item is answered.

7 min readPublished 31 August 2026
WhatsApp Fedari

Start by reading your report

Your Fedari report lists every finding with photographs, a room-by-room location and a severity label — Critical, Major, Minor or Advisory. Before you send anything, read it once end to end. The severity labels are practical prioritisation tools: Critical and Major items are the ones to put first in your communication, while Minor and Advisory items round out the complete picture.

Keep the original PDF unchanged. It is your dated, independent record of the property's condition on the inspection day — everything you send or discuss later traces back to it.

Submit through the developer's own channel

Most Dubai developers have a defined channel for defect reporting: a customer-care portal, a handover app, or a dedicated email address for after-sales service. Use that channel — it routes your report to the team that can act on it and creates a reference number automatically.

When you submit, attach the full report and ask for written confirmation of receipt with a reference number. That confirmation, plus the date, is the anchor for every follow-up conversation afterwards.

What to include when you submit

A complete, easy-to-process submission typically contains:

  • The full inspection report PDF, unedited
  • Your unit details: building, unit number, community and handover date
  • Your contact details and preferred response channel
  • A short covering note highlighting the Critical and Major items by their report reference
  • A polite, clear request: review, confirm which items are accepted, and share the rectification plan and timeline

Following up professionally

Give the developer's team a reasonable window to respond, then follow up in writing against your reference number. Written follow-ups — email or portal messages — create a record that phone calls do not. If an item is repaired, note the date; if an item is disputed, note the reason given.

Stay factual. The report does the arguing for you: photographs, locations and severity labels are difficult to dismiss, and a calm paper trail keeps the conversation moving.

If items are disputed or refused

Developers sometimes decline items — for example as 'within tolerance' or outside the applicable warranty. What is accepted, rejected or rectified is governed by your contract and the developer's process; Fedari documents the condition and does not promise that any party will accept or repair a reported item.

If a significant item is disputed, you can request the specific basis for the rejection in writing and, where needed, seek advice from an appropriately qualified specialist or legal adviser about your contract position. Nothing in this guide is legal advice — it is practical process guidance from an inspector's perspective.

After the fixes: the reinspection

When the developer reports the items as rectified, a reinspection visually reviews the apparent status of the previously reported findings. Reinspections start from AED 399. You receive an updated, documented view of what is resolved and what still needs attention — so the loop closes with evidence, not assumptions.

Ready for a professional inspection?

Independent, licensed inspection with a photo-led report delivered within 8 hours after the inspection is completed.

FAQs

Should I send the whole report or just the major items?

Send the whole report, unedited, and highlight the Critical and Major items in your covering note. A complete submission prevents individual findings from being quietly dropped.

How long does a developer take to respond?

Response and rectification timelines vary by developer and are governed by your contract and their process. Ask for the expected timeline in writing when you submit, and follow up against your reference number.

Can Fedari submit the report to the developer for me?

Where you ask us to, we can send or discuss the report with the developer or your access coordinator. The formal defect submission itself is usually made by you as the owner, through the developer's channel.

What if the developer says a defect is 'within tolerance'?

Ask for the basis in writing and keep it with your records. Whether an item is accepted is subject to your contract; for significant disputes, a suitably qualified specialist or legal adviser can assess your position.

Do I need a reinspection after repairs?

It is strongly recommended. A reinspection (from AED 399) visually reviews the apparent status of previously reported items, so you have documented confirmation of what was actually resolved.

Related guides & services

Fedari Inspection
Get in touch

Get your quote — we reply quickly.

Tell us about your property and we'll send an exact, no-obligation quote. Prefer to talk? Message a real inspector on WhatsApp now.

WhatsApp Fedari